certification menu
Tower Refurbishments
Even with excellent water treatment programmes and regular maintenance there will become a time in their life when refurbishment will be required.
This will be dependent on the tower type, material of construction etc
Premier (C&D) Ltd will assess the condition of the cooling tower and make recommendations for modification or refurbishment including, but not exclusively, the following
- New pack installation
- New high efficiency drift eliminators
- New distribution troughs or nozzles
- Pack epoxy coating corrosion protection. Click here to view our PDF flyer