Domestic Header Tanks

The HSE have set out guidelines in the L8 Approved Code of Practice as to the design and sizing of domestic header tanks.

 

A typical header tankOn many older establishments, or where there have been substantial changes, some of the associated domestic header tanks do not comply with these guidelines, also on older galvanised tanks corrosion can be a major issue. Premier (C&D) Ltd will assess your header tanks and advise if they are up to current guidelines and if not what would be required to bring them up to current specification

 

These works could consist of, but not exclusively, the following

  • Header tank renewal with system design to current guidelines
  • Header tank modification to bring up to current guidelines
  • Header tank removal completely with all systems being converted to direct town's main supply
  • Pack epoxy coating of surface corroded header tanks