Cooling Systems
The HSE L8 Approved Code of Practice states that cooling towers should be cleaned a minimum every 6 months and that where possible drift eliminators and pack should be removed for cleaning and inspection.

The Premier (C&D) Ltd cleaning regime consists of the following
- Pre-chlorination prior to commencement of cleaning in accordance with HSE L8 guidelines
- Removal, where possible, and cleaning of drift eliminators
- Cleaning of distribution systems
- Removal, where possible, and cleaning of pack
- Draining and cleaning of sump
- Post chlorination in accordance with HSE L8 guidelines
- Written report left on site and a follow up “Cleaning & Disinfection Report” complete with photographs before and after clean produced